Project: 4661 Samdal Wind Power project - Request for post-registration changes
Project 4661 Samdal Wind Power project
PRC ref PRC-4661-001
Process track Issuance
DOE DTSUS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Jul 11 - 30 Jun 21
Assessment opinion Assessment opinion (189 KB)
Revised PDD Revised PDD (2134 KB)   Revised PDD - track changes (2171 KB)
Supplementary documents Appendix 1 - Appendix 1. Notification of the result of the test before use.pdf (103 KB)
Appendix 2 - Appendix 2. Power market operation regulation.pdf (83 KB)
Appendix 3 - Appendix 3. Revision point of internal calibration regulation of KEPCO.pdf (488 KB)
Appendix 4 - Appendix 4. Measures Act.pdf (307 KB)
Signed form Signed form (444 KB)
DOE clarification
VVS version VVS 2.0
Current status 28 Mar 14 - Approved
Effective approval date: 28 Mar 14
Historic statuses 27 Feb 14 - Request published