Project: 1737 Methane Recovery for Onsite Utilisation Project at Desa Kim Loong Palm Oil Mill, Sook, Keningau, Sabah, Malaysia - Request for post-registration changes
Project 1737 Methane Recovery for Onsite Utilisation Project at Desa Kim Loong Palm Oil Mill, Sook, Keningau, Sabah, Malaysia
PRC ref PRC-1737-002
Process track Issuance
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 10 Oct 2010 - 31 Jul 2011
Assessment opinion Assessment opinion (149 KB)
Revised PDD  
Supplementary documents
Signed form Signed form (54 KB)
DOE clarification
VVS version VVS 2.0
Current status 22 Nov 13 - Approved
Effective approval date: 22 Nov 13
Historic statuses 25 Oct 13 - Request published