Project: 9830 Cucuana Hydroelectric Power Plant - Request for post-registration changes
Project 9830 Cucuana Hydroelectric Power Plant
PRC ref PRC-9830-001
Process track Issuance
DOE Earthood
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 Nov 2014 - 13 Jun 2015

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Nov 14 - 31 Oct 21
Assessment opinion Assessment opinion (266 KB)
Revised PDD Revised PDD (1673 KB)   Revised PDD - track changes (1676 KB)
Supplementary documents
Signed form Signed form (117 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 22 Aug 19 - Approved
Effective approval date: 22 Aug 19
Historic statuses 24 Jul 19 - Request published