Project: 0171 Caieiras landfill gas emission reduction - Request for post-registration changes
Project 0171 Caieiras landfill gas emission reduction
PRC ref PRC-0171-004
Process track Prior approval
DOE EPIC
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? No

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on:
Applicable crediting period 13 Dec 13 - 30 Mar 20
Assessment opinion Assessment opinion (1741 KB)
Revised PDD Revised PDD (5196 KB)   Revised PDD - track changes (5492 KB)
Supplementary documents Appendix 1 - 11 Sep 2017_CER CAI - V.7.2 - 01.08.2017.xlsx (107 KB)
Appendix 2 - 11 Sep 2017_Financial CAI - V.7.2 - 01.08.2017.xlsm (156 KB)
Signed form Signed form (233 KB)
DOE clarification DOE clarification 1 - coPDD_Caieiras v 7.3 23.10.2017- clean.pdf (5261 KB)
DOE clarification 2 - coPDD_Caieiras v 7.3 23.10.2017- tracked changes.pdf (5425 KB)
DOE clarification 3 - coPRC Report Caeiras LFG Project - 02.11.2017 fixed margins (2).pdf (1415 KB)
DOE clarification 4 - EPIC response to received request of clarifications Caieiras LFG project 02.11.2017_2.pdf (383 KB)
VVS version VVS-PA 1.0
Current status 05 Mar 18 - Rejected
Effective rejection date: 01 Mar 18. Reason (170 KB)
Historic statuses 25 Sep 17 - Published
19 Oct 17 - Awaiting DOE clarifications
30 Oct 17 - DOE clarifications received
30 Oct 17 - Summary note being prepared
23 Nov 17 - Request added to EB98 meeting agenda