Project: 3254 Hainan Chengpo Hydropower Project - Request for post-registration changes
Project 3254 Hainan Chengpo Hydropower Project
PRC ref PRC-3254-001
Process track Issuance
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Jan 11 - 31 Dec 17
Assessment opinion Assessment opinion (43 KB)
Revised PDD Revised PDD (628 KB)   Revised PDD - track changes (628 KB)
Supplementary documents
Signed form Signed form (209 KB)
DOE clarification
VVS version VVS 2.0
Current status 16 Aug 12 - Approved
Effective approval date: 16 Aug 12
Historic statuses 18 Jul 12 - Request published