Project:
6715 Chancay Hydroelectric Power Plant
- Request for post-registration changes
Project | 6715 Chancay Hydroelectric Power Plant |
---|---|
PRC ref | PRC-6715-002 |
Process track | Issuance |
DOE | ICONTEC |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Changes to the project or programme design
|
Applicable crediting period | 01 Jan 16 - 31 Dec 22 |
Assessment opinion | Assessment opinion (367 KB) |
Revised PDD | Revised PDD (3912 KB) Revised PDD - track changes (4067 KB) |
Supplementary documents | |
Signed form | Signed form (1281 KB) |
DOE clarification | |
VVS version | VVS-PA 3.0 |
Current status | 07 Dec 22 - Request published |