17:02 15 Jan 25
Project:
2621 Methane Recovery in Wastewater Treatment, Project AIN07-W-05, Sumatera Utara, Indonesia
- Request for post-registration changes
Project | 2621 Methane Recovery in Wastewater Treatment, Project AIN07-W-05, Sumatera Utara, Indonesia |
---|---|
PRC ref | PRC-2621-001 |
Process track | Prior approval |
DOE | KBS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Corrections that do not affect project design
Changes to the project or programme design
|
Applicable crediting period | 12 Nov 16 - 11 Nov 23 |
Assessment opinion | Assessment opinion (466 KB) |
Revised PDD | Revised PDD (908 KB) Revised PDD - track changes (987 KB) |
Supplementary documents |
Appendix 1 - PT Tolan Tiga ER Sheet V03_PRC.xlsx (28 KB)
|
Signed form | Signed form (248 KB) |
DOE clarification |
DOE clarification 1 - PDD_2621_PRC_V13_UN_clean.pdf (1405 KB)
DOE clarification 2 - PDD_2621_PRC_V13_UN_tracked.pdf (1510 KB) DOE clarification 3 - PRC Validation Report_Clean.pdf (809 KB) DOE clarification 4 - UNFCCC comments.pdf (385 KB) DOE clarification 5 - Updated PRC Form.pdf (248 KB) DOE clarification 6 - Clarification Docs.zip (2034 KB) |
VVS version | VVS-PA 2.0 |
Current status | 22 Feb 21 -
Approved
Effective approval date: 21 Feb 21
|
Historic statuses |
21 Dec 20 -
Published 15 Jan 21 - Awaiting DOE clarifications 29 Jan 21 - DOE clarifications received 29 Jan 21 - Summary note being prepared 01 Feb 21 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: