Project: 2621 Methane Recovery in Wastewater Treatment, Project AIN07-W-05, Sumatera Utara, Indonesia - Request for post-registration changes
Project 2621 Methane Recovery in Wastewater Treatment, Project AIN07-W-05, Sumatera Utara, Indonesia
PRC ref PRC-2621-001
Process track Prior approval
DOE KBS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Changes to the project or programme design
  • Changes have an impact on: Addition of new components or extension/addition of technologies/measures that introduce:
Applicable crediting period 12 Nov 16 - 11 Nov 23
Assessment opinion Assessment opinion (466 KB)
Revised PDD Revised PDD (908 KB)   Revised PDD - track changes (987 KB)
Supplementary documents Appendix 1 - PT Tolan Tiga ER Sheet V03_PRC.xlsx (28 KB)
Signed form Signed form (248 KB)
DOE clarification DOE clarification 1 - PDD_2621_PRC_V13_UN_clean.pdf (1405 KB)
DOE clarification 2 - PDD_2621_PRC_V13_UN_tracked.pdf (1510 KB)
DOE clarification 3 - PRC Validation Report_Clean.pdf (809 KB)
DOE clarification 4 - UNFCCC comments.pdf (385 KB)
DOE clarification 5 - Updated PRC Form.pdf (248 KB)
DOE clarification 6 - Clarification Docs.zip (2034 KB)

VVS version VVS-PA 2.0
Current status 22 Feb 21 - Approved
Effective approval date: 21 Feb 21
Historic statuses 21 Dec 20 - Published
15 Jan 21 - Awaiting DOE clarifications
29 Jan 21 - DOE clarifications received
29 Jan 21 - Summary note being prepared
01 Feb 21 - Awaiting EB decision