12:19 15 Nov 25
Project:
2621 Methane Recovery in Wastewater Treatment, Project AIN07-W-05, Sumatera Utara, Indonesia
- Request for post-registration changes
| Project | 2621 Methane Recovery in Wastewater Treatment, Project AIN07-W-05, Sumatera Utara, Indonesia |
|---|---|
| PRC ref | PRC-2621-001 |
| Process track | Prior approval |
| DOE | KBS |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
| Type of submission |
Corrections that do not affect project design
Changes to the project or programme design
|
| Applicable crediting period | 12 Nov 16 - 11 Nov 23 |
| Assessment opinion |
Assessment opinion (466 KB)
|
| Revised PDD |
Revised PDD (908 KB)
Revised PDD - track changes (987 KB)
|
| Supplementary documents |
Appendix 1 - PT Tolan Tiga ER Sheet V03_PRC.xlsx (28 KB)
|
| Signed form |
Signed form (248 KB)
|
| DOE clarification |
DOE clarification 1 - PDD_2621_PRC_V13_UN_clean.pdf (1405 KB)
DOE clarification 2 - PDD_2621_PRC_V13_UN_tracked.pdf (1510 KB)
DOE clarification 3 - PRC Validation Report_Clean.pdf (809 KB)
DOE clarification 4 - UNFCCC comments.pdf (385 KB)
DOE clarification 5 - Updated PRC Form.pdf (248 KB)
DOE clarification 6 - Clarification Docs.zip (2034 KB)
|
| VVS version | VVS-PA 2.0 |
| Current status | 22 Feb 21 -
Approved
Effective approval date: 21 Feb 21
|
| Historic statuses |
21 Dec 20 -
Published 15 Jan 21 - Awaiting DOE clarifications 29 Jan 21 - DOE clarifications received 29 Jan 21 - Summary note being prepared 01 Feb 21 - Awaiting EB decision |

Assessment opinion
Appendix 1 - PT Tolan Tiga ER Sheet V03_PRC.xlsx
DOE clarification 6 - Clarification Docs.zip
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: