Project: 0984 Golden Hope Composting Project - Lavang - Request for post-registration changes
Project 0984 Golden Hope Composting Project - Lavang
PRC ref PRC-0984-001
Process track Prior approval
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 Apr 2010 - 31 Aug 2011

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 14 Dec 07 - 13 Dec 14
Assessment opinion Assessment opinion (269 KB)
Revised PDD Revised PDD (693 KB)   Revised PDD - track changes (995 KB)
Supplementary documents
Signed form Signed form (161 KB)
DOE clarification DOE clarification 1 - 20120817_CER estimation Lavang_MP_14.12.2007 - 30.09.2011_ver 09.xls (4557 KB)
DOE clarification 2 - 20120817_LAVANG SSCPDD GH Composting III F.pdf (693 KB)
DOE clarification 3 - 6_LAVANG SSCPDD GH Composting III F_track change for clarification request (version 07 track change).pdf (681 KB)
VVS version VVS 2.0
Current status 27 Sep 12 - Approved
Effective approval date: 27 Sep 12
Historic statuses 24 Jul 12 - Published
13 Aug 12 - Awaiting DOE clarifications
27 Aug 12 - DOE clarifications received
27 Aug 12 - Summary note being prepared
06 Sep 12 - Awaiting EB decision