Project: 0999 119.8 MW Natural Gas based Combined Cycle Power Plant, at Tanjavur, Tamilnadu by M/s Aban Power Company Limited - Request for post-registration changes
Project 0999 119.8 MW Natural Gas based Combined Cycle Power Plant, at Tanjavur, Tamilnadu by M/s Aban Power Company Limited
PRC ref PRC-0999-001
Process track Prior approval
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? No

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 01 Jan 06 - 31 Dec 15
Assessment opinion Assessment opinion (253 KB)
Revised PDD Revised PDD (519 KB)   Revised PDD - track changes (608 KB)
Supplementary documents
Signed form Signed form (134 KB)
DOE clarification
VVS version VVS 2.0
Current status 22 Feb 13 - Approved
Effective approval date: 20 Feb 13
Historic statuses 29 Jan 13 - Published
29 Jan 13 - Summary note being prepared
31 Jan 13 - Awaiting EB decision