19:50 25 Jan 25
Project:
0999 119.8 MW Natural Gas based Combined Cycle Power Plant, at Tanjavur, Tamilnadu by M/s Aban Power Company Limited
- Request for post-registration changes
Project | 0999 119.8 MW Natural Gas based Combined Cycle Power Plant, at Tanjavur, Tamilnadu by M/s Aban Power Company Limited |
---|---|
PRC ref | PRC-0999-001 |
Process track | Prior approval |
DOE | SGS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 01 Jan 06 - 31 Dec 15 |
Assessment opinion | Assessment opinion (253 KB) |
Revised PDD | Revised PDD (519 KB) Revised PDD - track changes (608 KB) |
Supplementary documents | |
Signed form | Signed form (134 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 22 Feb 13 -
Approved
Effective approval date: 20 Feb 13
|
Historic statuses |
29 Jan 13 -
Published 29 Jan 13 - Summary note being prepared 31 Jan 13 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: