23:40 14 Nov 25
Project:
0389 Waste heat recovery project based on technology up-gradation at Apollo Tyres, Vadodara, India
- Request for post-registration changes
| Project | 0389 Waste heat recovery project based on technology up-gradation at Apollo Tyres, Vadodara, India |
|---|---|
| PRC ref | PRC-0389-001 |
| Process track | Prior approval |
| DOE | SGS |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Changes to the project or programme design
|
| Applicable crediting period | 01 Jan 05 - 31 Dec 14 |
| Assessment opinion |
Assessment opinion (660 KB)
|
| Revised PDD |
Revised PDD (1694 KB)
Revised PDD - track changes (3779 KB)
|
| Supplementary documents |
Appendix 1 - Enclosure-1-IRR-Coal Turbine.zip (60 KB)
Appendix 2 - Enclosure-1-IRR-Gas Turbine.zip (38 KB)
Appendix 3 - Enclosure-1-IRR-Petcoke.zip (38 KB)
|
| Signed form |
Signed form (53 KB)
|
| DOE clarification |
DOE clarification 1 - Revised Validation opinion_final.pdf (660 KB)
DOE clarification 2 - Apollo Tyres SSC_ PDD_Version 09 TC.pdf (3779 KB)
DOE clarification 3 - Apollo Tyres SSC_ PDD_Version 09.pdf (1694 KB)
|
| VVS version | VVS 2.0 |
| Current status | 09 Oct 13 -
Approved
Effective approval date: 09 Oct 13
|
| Historic statuses |
06 Aug 13 -
Published 20 Aug 13 - Awaiting DOE clarifications 03 Sep 13 - DOE clarifications received 03 Sep 13 - Summary note being prepared 18 Sep 13 - Awaiting EB decision |

Assessment opinion
Appendix 1 - Enclosure-1-IRR-Coal Turbine.zip
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: