Project: 0593 15.4 MW wind farm at Satara District, Maharashtra. - Request for post-registration changes
Project 0593 15.4 MW wind farm at Satara District, Maharashtra.
PRC ref PRC-0593-001
Process track Issuance
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Apr 02 - 31 Mar 12
Assessment opinion Assessment opinion (208 KB)
Revised PDD Revised PDD (611 KB)   Revised PDD - track changes (611 KB)
Supplementary documents
Signed form Signed form (140 KB)
DOE clarification
VVS version VVS 2.0
Current status 28 Nov 14 - Approved
Effective approval date: 28 Nov 14
Historic statuses 30 Oct 14 - Request published