06:07 09 Nov 24
Project:
0593 15.4 MW wind farm at Satara District, Maharashtra.
- Request for post-registration changes
Project | 0593 15.4 MW wind farm at Satara District, Maharashtra. |
---|---|
PRC ref | PRC-0593-001 |
Process track | Issuance |
DOE | DNV |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Changes to the project or programme design
|
Applicable crediting period | 01 Apr 02 - 31 Mar 12 |
Assessment opinion | Assessment opinion (208 KB) |
Revised PDD | Revised PDD (611 KB) Revised PDD - track changes (611 KB) |
Supplementary documents | |
Signed form | Signed form (140 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 28 Nov 14 -
Approved
Effective approval date: 28 Nov 14
|
Historic statuses |
30 Oct 14 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: