Project: 1790 CEMEX Colombia: Biomass project at Caracolito cement plant. - Request for post-registration changes
Project 1790 CEMEX Colombia: Biomass project at Caracolito cement plant.
PRC ref PRC-1790-001
Process track Issuance
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Apr 09 - 31 Mar 19
Assessment opinion Assessment opinion (731 KB)
Revised PDD Revised PDD (1439 KB)   Revised PDD - track changes (1727 KB)
Supplementary documents Appendix 1 - 1790 IRR Calculation.xls (291 KB)
Signed form Signed form (50 KB)
DOE clarification
VVS version VVS 2.0
Current status 12 Mar 13 - Approved
Effective approval date: 12 Mar 13
Historic statuses 11 Feb 13 - Request published