21:03 10 Jan 25
Project:
1790 CEMEX Colombia: Biomass project at Caracolito cement plant.
- Request for post-registration changes
Project | 1790 CEMEX Colombia: Biomass project at Caracolito cement plant. |
---|---|
PRC ref | PRC-1790-001 |
Process track | Issuance |
DOE | TÜV NORD |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Changes to the project or programme design
|
Applicable crediting period | 01 Apr 09 - 31 Mar 19 |
Assessment opinion | Assessment opinion (731 KB) |
Revised PDD | Revised PDD (1439 KB) Revised PDD - track changes (1727 KB) |
Supplementary documents |
Appendix 1 - 1790 IRR Calculation.xls (291 KB)
|
Signed form | Signed form (50 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 12 Mar 13 -
Approved
Effective approval date: 12 Mar 13
|
Historic statuses |
11 Feb 13 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: