Project: 3511 7.5 MW wind energy project by Taurian Iron and Steel in the State of Gujarat - Request for post-registration changes
Project 3511 7.5 MW wind energy project by Taurian Iron and Steel in the State of Gujarat
PRC ref PRC-3511-001
Process track Prior approval
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 16 Sep 10 - 15 Sep 20
Assessment opinion Assessment opinion (226 KB)
Revised PDD Revised PDD (857 KB)   Revised PDD - track changes (896 KB)
Supplementary documents
Signed form Signed form (170 KB)
DOE clarification
VVS version VVS 2.0
Current status 09 Sep 13 - Approved
Effective approval date: 08 Aug 13
Historic statuses 03 Jul 13 - Published
03 Jul 13 - Summary note being prepared
18 Jul 13 - Awaiting EB decision