Project: 6113 Wind power project at Landewadi by SIIL - Request for post-registration changes
Project 6113 Wind power project at Landewadi by SIIL
PRC ref PRC-6113-001
Process track Issuance
DOE EPIC
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Jan 13 - 31 Dec 23
Assessment opinion Assessment opinion (344 KB)
Revised PDD Revised PDD (820 KB)   Revised PDD - track changes (825 KB)
Supplementary documents
Signed form Signed form (122 KB)
DOE clarification
VVS version VVS 2.0
Current status 05 Dec 16 - Approved
Effective approval date: 05 Dec 16
Historic statuses 04 Nov 16 - Request published