Project:
2436 Guohua Dongying Hekou 49.5 MW Wind Farm Project (Phase 1)
- Request for post-registration changes
Project | 2436 Guohua Dongying Hekou 49.5 MW Wind Farm Project (Phase 1) |
---|---|
PRC ref | PRC-2436-001 |
Process track | Issuance |
DOE | BVI |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
|
Applicable crediting period | 03 Jul 09 - 02 Jul 16 |
Assessment opinion | Assessment opinion (116 KB) |
Revised PDD | Revised PDD (880 KB) Revised PDD - track changes (1653 KB) |
Supplementary documents | |
Signed form | Signed form (345 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 05 Mar 13 -
Approved
Effective approval date: 05 Mar 13
|
Historic statuses |
04 Feb 13 -
Request published |