Project: 3193 Wayang Windu Phase 2 Geothermal Power Project - Request for post-registration changes
Project 3193 Wayang Windu Phase 2 Geothermal Power Project
PRC ref PRC-3193-001
Process track Issuance
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 02 Dec 2017 - 30 Jun 2021
Assessment opinion Assessment opinion (679 KB)
Revised PDD  
Supplementary documents
Signed form Signed form (317 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 22 Jul 22 - Approved
Effective approval date: 22 Jul 22
Historic statuses 23 Jun 22 - Request published