Project:
3193 Wayang Windu Phase 2 Geothermal Power Project
- Request for post-registration changes
Project | 3193 Wayang Windu Phase 2 Geothermal Power Project |
---|---|
PRC ref | PRC-3193-001 |
Process track | Issuance |
DOE | TÜV NORD |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
|
Assessment opinion | Assessment opinion (679 KB) |
Revised PDD | |
Supplementary documents | |
Signed form | Signed form (317 KB) |
DOE clarification | |
VVS version | VVS-PA 3.0 |
Current status | 22 Jul 22 -
Approved
Effective approval date: 22 Jul 22
|
Historic statuses |
23 Jun 22 -
Request published |