04:18 09 Nov 24
Project:
6568 Landfills’ gas capture, flaring and use program in Morocco
- Request for post-registration changes
Project | 6568 Landfills’ gas capture, flaring and use program in Morocco |
---|---|
PRC ref | PRC-6568-001 |
Process track | Prior approval |
DOE | TÜV NORD |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 17 Dec 13 - 16 Dec 20 |
Assessment opinion | Assessment opinion (720 KB) |
Revised PDD | Revised PDD (1024 KB) Revised PDD - track changes (1690 KB) |
Supplementary documents |
Appendix 1 - CPA-DD Oum Azza_ER Calculation_21Aug2019.xls (191 KB)
Appendix 2 - CPA-DD Oum Azza_FA_v_3_20March2019.xls (216 KB) |
Signed form | Signed form (187 KB) |
DOE clarification |
DOE clarification 1 - OumAzza CPA_DD_21Aug2019_TC.pdf (1074 KB)
|
VVS version | VVS-PoA 2.0 |
Current status | 25 Nov 19 -
Approved
Effective approval date: 24 Nov 19
|
Historic statuses |
30 Sep 19 -
Published 14 Oct 19 - Awaiting DOE clarifications 24 Oct 19 - DOE clarifications received 24 Oct 19 - Summary note being prepared 04 Nov 19 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: