Project: 6568 Landfills’ gas capture, flaring and use program in Morocco - Request for post-registration changes
Project 6568 Landfills’ gas capture, flaring and use program in Morocco
PRC ref PRC-6568-001
Process track Prior approval
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: Addition or change of technologies/measures with or without addition or change of applied methodologies
Applicable crediting period 17 Dec 13 - 16 Dec 20
Assessment opinion Assessment opinion (720 KB)
Revised PDD Revised PDD (1024 KB)   Revised PDD - track changes (1690 KB)
Supplementary documents Appendix 1 - CPA-DD Oum Azza_ER Calculation_21Aug2019.xls (191 KB)
Appendix 2 - CPA-DD Oum Azza_FA_v_3_20March2019.xls (216 KB)
Signed form Signed form (187 KB)
DOE clarification DOE clarification 1 - OumAzza CPA_DD_21Aug2019_TC.pdf (1074 KB)
VVS version VVS-PoA 2.0
Current status 25 Nov 19 - Approved
Effective approval date: 24 Nov 19
Historic statuses 30 Sep 19 - Published
14 Oct 19 - Awaiting DOE clarifications
24 Oct 19 - DOE clarifications received
24 Oct 19 - Summary note being prepared
04 Nov 19 - Awaiting EB decision