Project: 8954 Coega IDZ Windfarm - Request for post-registration changes
Project 8954 Coega IDZ Windfarm
PRC ref PRC-8954-001
Process track Issuance
DOE Carbon Check
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Aug 13 - 31 Jul 20
Assessment opinion Assessment opinion (633 KB)
Revised PDD Revised PDD (517 KB)   Revised PDD - track changes (573 KB)
Supplementary documents Appendix 1 - 2021-06-25 Coega Wind Farm ex-ante calculations v3.xlsx (161 KB)
Appendix 2 - 2021-06-25 Coega Wind IRR model 1.8 MW v3.xlsx (172 KB)
Signed form Signed form (150 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 09 Sep 21 - Approved
Effective approval date: 09 Sep 21
Historic statuses 11 Aug 21 - Request published