Project: 0031 Methane capture and combustion from swine manure treatment for Corneche and Los Guindos - Request for post-registration changes
Project 0031 Methane capture and combustion from swine manure treatment for Corneche and Los Guindos
PRC ref PRC-0031-001
Process track Prior approval
DOE AENOR
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? No

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 May 02 - 30 Apr 09
Assessment opinion Assessment opinion (356 KB)
Revised PDD Revised PDD (838 KB)   Revised PDD - track changes (3247 KB)
Supplementary documents Appendix 1 - NPV Los Guindos (public).xls (25 KB)
Appendix 2 - PDD CER Calculation.xls (43 KB)
Appendix 3 - ER calculation.zip (120 KB)
Signed form Signed form (1188 KB)
DOE clarification DOE clarification 1 - Clarification Corneche & Los Guindos.pdf (215 KB)
DOE clarification 2 - Assessment opinion on the changes_Corneche & Los Guindos_final_prior approval_v3.pdf (341 KB)
DOE clarification 3 - PDD Corneche & LosGuindos 2013 clean 30012014.pdf (840 KB)
DOE clarification 4 - PDD Corneche & LosGuindos 2013 track changes 30012014.pdf (3249 KB)
DOE clarification 5 - AENOR response Request for clarification_Corneche & Los Guindos_140228.pdf (680 KB)
VVS version VVS 2.0
Current status 02 Jun 14 - Approved
Effective approval date: 23 May 14
Historic statuses 07 Jan 14 - Published
14 Feb 14 - Awaiting DOE clarifications
28 Feb 14 - DOE clarifications received
28 Feb 14 - Summary note being prepared
02 May 14 - Awaiting EB decision