Project: 9741 Cabo Leones Wind Farm - Request for post-registration changes
Project 9741 Cabo Leones Wind Farm
PRC ref PRC-9741-003
Process track Issuance
DOE Earthood
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 12 Jun 18 - 11 Jun 25
Assessment opinion Assessment opinion (272 KB)
Revised PDD Revised PDD (3799 KB)   Revised PDD - track changes (4124 KB)
Supplementary documents Appendix 1 - 220719_IRR_C Leones.xlsx (284 KB)
Signed form Signed form (158 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 19 Jan 23 - Approved
Effective approval date: 19 Jan 23
Historic statuses 21 Dec 22 - Request published