Project: 4176 Ibi Batéké degraded savannah afforestation project for fuelwood production (Democratic Republic of Congo) - Request for post-registration changes
Project 4176 Ibi Batéké degraded savannah afforestation project for fuelwood production (Democratic Republic of Congo)
PRC ref PRC-4176-002
Process track Renewal
DOE RINA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Combined with a request for renewal of crediting period (See footnote 2 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes specific to A/R project activities
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Jul 08 - 30 Jun 38
Assessment opinion Assessment opinion (446 KB)
Revised PDD Revised PDD (3293 KB)   Revised PDD - track changes (3545 KB)
Supplementary documents
Signed form Signed form (174 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 18 Sep 20 - Approved
Effective approval date: 18 Sep 20
Historic statuses 20 Aug 20 - Request published