Project: 8646 Olkaria IV Geothermal Project - Request for post-registration changes
Project 8646 Olkaria IV Geothermal Project
PRC ref PRC-8646-001
Process track Issuance
DOE AENOR
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 Jan 2015 - 30 Sep 2015

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Sep 14 - 31 Aug 21
Assessment opinion Assessment opinion (334 KB)
Revised PDD Revised PDD (1377 KB)   Revised PDD - track changes (1430 KB)
Supplementary documents
Signed form Signed form (153 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 27 Aug 21 - Approved
Effective approval date: 27 Aug 21
Historic statuses 29 Jul 21 - Request published