14:47 12 Dec 24
Project:
6762 Methane Capture and Utilization Project at Carotino Palm Oil Mill, Malaysia
- Request for post-registration changes
Project | 6762 Methane Capture and Utilization Project at Carotino Palm Oil Mill, Malaysia |
---|---|
PRC ref | PRC-6762-003 |
Process track | Issuance |
DOE | TÜV SÜD |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
|
Assessment opinion | Assessment opinion (378 KB) |
Revised PDD | |
Supplementary documents |
Appendix 1 - 6762_Carotino_MR 01012020 to 31122020_v2_Rev2_050324.pdf (872 KB)
Appendix 2 - 6762_Carotino_ER cal_v2_01012020 to 31122020_Rev2 (1).xlsx (259 KB) |
Signed form | Signed form (160 KB) |
DOE clarification | |
VVS version | VVS-PA 3.0 |
Current status | 31 Oct 24 -
Approved
Effective approval date: 31 Oct 24
|
Historic statuses |
02 Oct 24 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: