20:20 01 Nov 25
Project:
6762 Methane Capture and Utilization Project at Carotino Palm Oil Mill, Malaysia
- Request for post-registration changes
| Project | 6762 Methane Capture and Utilization Project at Carotino Palm Oil Mill, Malaysia |
|---|---|
| PRC ref | PRC-6762-003 |
| Process track | Issuance |
| DOE | TÜV SÜD |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
|
| Assessment opinion |
Assessment opinion (378 KB)
|
| Revised PDD | |
| Supplementary documents |
Appendix 1 - 6762_Carotino_MR 01012020 to 31122020_v2_Rev2_050324.pdf (872 KB)
Appendix 2 - 6762_Carotino_ER cal_v2_01012020 to 31122020_Rev2 (1).xlsx (259 KB)
|
| Signed form |
Signed form (160 KB)
|
| DOE clarification | |
| VVS version | VVS-PA 3.0 |
| Current status | 31 Oct 24 -
Approved
Effective approval date: 31 Oct 24
|
| Historic statuses |
02 Oct 24 -
Request published |

Assessment opinion
Appendix 2 - 6762_Carotino_ER cal_v2_01012020 to 31122020_Rev2 (1).xlsx
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: