Project: 0159 Moldova Biomass Heating in Rural Communities (Project Design Document No. 1) - Request for post-registration changes
Project 0159 Moldova Biomass Heating in Rural Communities (Project Design Document No. 1)
PRC ref PRC-0159-001
Process track Prior approval
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 20 Jan 06 - 19 Jan 16
Assessment opinion Assessment opinion (328 KB)
Revised PDD Revised PDD (1673 KB)   Revised PDD - track changes (1726 KB)
Supplementary documents Appendix 1 - 0159_ER spreadsheet_rev 01052014.xls (266 KB)
Appendix 2 - 0159_MP_rev_justificationv3-thermal efficiency added.xls (82 KB)
Appendix 3 - 0159-NPV-02-12.xls (370 KB)
Appendix 4 - 0159-APPENDIX-1-02-12.pdf (584 KB)
Appendix 5 - 0159-APPENDIX-2-02-12.pdf (1459 KB)
Appendix 6 - 0159-APPENDIX-3-02-12.pdf (308 KB)
Appendix 7 - 0159-APPENDIX-4-02-12.pdf (71 KB)
Appendix 8 - 0159-APPENDIX-5-01-12.pdf (1129 KB)
Signed form Signed form (154 KB)
DOE clarification DOE clarification 1 - 0159-VPRC-02-12 with track changes.pdf (327 KB)
DOE clarification 2 - 0159_3rd Clarifications on PRC_2014-03-10.pdf (252 KB)
DOE clarification 3 - Step-wise protocol for measurements & calculations of boiler efficiency.pdf (264 KB)
DOE clarification 4 - Comparison with standard AIIR Romania 2010.pdf (530 KB)
DOE clarification 5 - Table A3 of pr.EN15378 2006E.pdf (81 KB)
DOE clarification 6 - 0159_Clarifications by DOE_2014-04-04.pdf (214 KB)
DOE clarification 7 - 0159_Clarifications by PP_2014-04-03.pdf (444 KB)
DOE clarification 8 - 0159_PRJC_5th clarification.pdf (304 KB)
DOE clarification 9 - 0159_Maximum losses mechanical incomplete combustion coal fired boiler_rev 01052014.xlsx (11 KB)
VVS version VVS 2.0
Current status 09 Jun 14 - Approved
Effective approval date: 06 Jun 14
Historic statuses 05 Nov 13 - Published
18 Apr 14 - Awaiting DOE clarifications
02 May 14 - DOE clarifications received
02 May 14 - Summary note being prepared
16 May 14 - Awaiting EB decision