Project: 4677 Vaayu India Wind Power Project in Andhra Pradesh - Request for post-registration changes
Project 4677 Vaayu India Wind Power Project in Andhra Pradesh
PRC ref PRC-4677-001
Process track Issuance
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 25 Apr 11 - 24 Apr 21
Assessment opinion Assessment opinion (1462 KB)
Revised PDD Revised PDD (1057 KB)   Revised PDD - track changes (1058 KB)
Supplementary documents
Signed form Signed form (1625 KB)
DOE clarification
VVS version VVS 2.0
Current status 22 Nov 12 - Approved
Effective approval date: 22 Nov 12
Historic statuses 24 Oct 12 - Request published