20:52 10 Jan 25
Project:
1795 Avoidance of methane production in POME treatment through Boustead Biotherm Palmass Technology
- Request for post-registration changes
Project | 1795 Avoidance of methane production in POME treatment through Boustead Biotherm Palmass Technology |
---|---|
PRC ref | PRC-1795-001 |
Process track | Prior approval |
DOE | DNV |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 25 Aug 08 - 24 Aug 15 |
Assessment opinion | Assessment opinion (311 KB) |
Revised PDD | Revised PDD (778 KB) Revised PDD - track changes (801 KB) |
Supplementary documents |
Appendix 1 - 20120612 Boustead MR1 ER calculation ver03.xls (97 KB)
|
Signed form | Signed form (215 KB) |
DOE clarification |
DOE clarification 1 - 20121030 BOUSTEAD_PDD_Revised ver09 _track change EB_.pdf (779 KB)
DOE clarification 2 - 20121030 BOUSTEAD_PDD_Revised ver09.pdf (778 KB) DOE clarification 3 - 19b. PIPOC 2007 Treatment of POM....pdf (2692 KB) DOE clarification 4 - BBPP Revised Letter.pdf (566 KB) DOE clarification 5 - Boustead Biotherm Drver Plant Operation.pdf (526 KB) DOE clarification 6 - Lab report.pdf (505 KB) DOE clarification 7 - 20121025 Boustead revised IRR rev2.xls (278 KB) |
VVS version | VVS 2.0 |
Current status | 05 Dec 12 -
Approved
Effective approval date: 05 Dec 12
|
Historic statuses |
03 Oct 12 -
Published 16 Oct 12 - Awaiting DOE clarifications 31 Oct 12 - DOE clarifications received 31 Oct 12 - Summary note being prepared 14 Nov 12 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: