Project: 1795 Avoidance of methane production in POME treatment through Boustead Biotherm Palmass Technology - Request for post-registration changes
Project 1795 Avoidance of methane production in POME treatment through Boustead Biotherm Palmass Technology
PRC ref PRC-1795-001
Process track Prior approval
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 25 Aug 2008 - 31 Jan 2011

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 25 Aug 08 - 24 Aug 15
Assessment opinion Assessment opinion (311 KB)
Revised PDD Revised PDD (778 KB)   Revised PDD - track changes (801 KB)
Supplementary documents Appendix 1 - 20120612 Boustead MR1 ER calculation ver03.xls (97 KB)
Signed form Signed form (215 KB)
DOE clarification DOE clarification 1 - 20121030 BOUSTEAD_PDD_Revised ver09 _track change EB_.pdf (779 KB)
DOE clarification 2 - 20121030 BOUSTEAD_PDD_Revised ver09.pdf (778 KB)
DOE clarification 3 - 19b. PIPOC 2007 Treatment of POM....pdf (2692 KB)
DOE clarification 4 - BBPP Revised Letter.pdf (566 KB)
DOE clarification 5 - Boustead Biotherm Drver Plant Operation.pdf (526 KB)
DOE clarification 6 - Lab report.pdf (505 KB)
DOE clarification 7 - 20121025 Boustead revised IRR rev2.xls (278 KB)




VVS version VVS 2.0
Current status 05 Dec 12 - Approved
Effective approval date: 05 Dec 12
Historic statuses 03 Oct 12 - Published
16 Oct 12 - Awaiting DOE clarifications
31 Oct 12 - DOE clarifications received
31 Oct 12 - Summary note being prepared
14 Nov 12 - Awaiting EB decision