Project: 8414 Potrero Hydropower Plant, Peru - Request for post-registration changes
Project 8414 Potrero Hydropower Plant, Peru
PRC ref PRC-8414-002
Process track Issuance
DOE Carbon Check
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Jun 16 - 31 May 23
Assessment opinion Assessment opinion (563 KB)
Revised PDD Revised PDD (1437 KB)   Revised PDD - track changes (1485 KB)
Supplementary documents Appendix 1 - Grid_EF_8414.zip (29 MB)
Signed form Signed form (7987 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 08 Apr 21 - Approved
Effective approval date: 08 Apr 21
Historic statuses 10 Mar 21 - Request published