19:57 28 Dec 24
Project:
8414 Potrero Hydropower Plant, Peru
- Request for post-registration changes
Project | 8414 Potrero Hydropower Plant, Peru |
---|---|
PRC ref | PRC-8414-002 |
Process track | Issuance |
DOE | Carbon Check |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 01 Jun 16 - 31 May 23 |
Assessment opinion | Assessment opinion (563 KB) |
Revised PDD | Revised PDD (1437 KB) Revised PDD - track changes (1485 KB) |
Supplementary documents |
Appendix 1 - Grid_EF_8414.zip (29 MB)
|
Signed form | Signed form (7987 KB) |
DOE clarification | |
VVS version | VVS-PA 2.0 |
Current status | 08 Apr 21 -
Approved
Effective approval date: 08 Apr 21
|
Historic statuses |
10 Mar 21 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: