00:01 11 Jan 25
Project:
1268 Tungabhadra wind power project in Karnataka
- Request for post-registration changes
Project | 1268 Tungabhadra wind power project in Karnataka |
---|---|
PRC ref | PRC-1268-001 |
Process track | Issuance |
DOE | SGS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
|
Applicable crediting period | 27 Oct 08 - 26 Oct 18 |
Assessment opinion | Assessment opinion (808 KB) |
Revised PDD | Revised PDD (3778 KB) Revised PDD - track changes (3828 KB) |
Supplementary documents |
Appendix 1 - Upload Information for Documents CDM.VER1403 MP4.pdf (90 KB)
|
Signed form | Signed form (61 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 12 Sep 14 -
Approved
Effective approval date: 12 Sep 14
|
Historic statuses |
14 Aug 14 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: