Project: 1268 Tungabhadra wind power project in Karnataka - Request for post-registration changes
Project 1268 Tungabhadra wind power project in Karnataka
PRC ref PRC-1268-001
Process track Issuance
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 27 Oct 08 - 26 Oct 18
Assessment opinion Assessment opinion (808 KB)
Revised PDD Revised PDD (3778 KB)   Revised PDD - track changes (3828 KB)
Supplementary documents Appendix 1 - Upload Information for Documents CDM.VER1403 MP4.pdf (90 KB)
Signed form Signed form (61 KB)
DOE clarification
VVS version VVS 2.0
Current status 12 Sep 14 - Approved
Effective approval date: 12 Sep 14
Historic statuses 14 Aug 14 - Request published