Project: 8405 Dong Nai 4 Hydropower Project - Request for post-registration changes
Project 8405 Dong Nai 4 Hydropower Project
PRC ref PRC-8405-001
Process track Prior approval
DOE BVI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 27 Nov 2012 - 30 Sep 2014

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 27 Nov 12 - 26 Nov 19
Assessment opinion Assessment opinion (310 KB)
Revised PDD Revised PDD (532 KB)   Revised PDD - track changes (529 KB)
Supplementary documents
Signed form Signed form (51 KB)
DOE clarification DOE clarification 1 - Emission reduction calculation_Dong Nai 4_revised 171114.xlsx (39 KB)
DOE clarification 2 - Dong Nai 4 - Respond for requests MR (01-04-2013)_VF.pdf (82 KB)
VVS version VVS 2.0
Current status 05 Jan 15 - Approved
Effective approval date: 19 Dec 14
Historic statuses 28 Oct 14 - Published
11 Nov 14 - Awaiting DOE clarifications
25 Nov 14 - DOE clarifications received
25 Nov 14 - Summary note being prepared
28 Nov 14 - Awaiting EB decision