01:01 09 Nov 25
Project:
5979 Methane recovery and combustion with renewable energy generation from anaerobic animal manure management systems under the Land Bank of the Philippines‘s (LBP) Carbon Finance Support Facility
- Request for post-registration changes
| Project | 5979 Methane recovery and combustion with renewable energy generation from anaerobic animal manure management systems under the Land Bank of the Philippines‘s (LBP) Carbon Finance Support Facility |
|---|---|
| PRC ref | PRC-5979-002 |
| Process track | Prior approval |
| DOE | TÜV NORD |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
| Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 10 May 12 - 09 May 19 |
| Assessment opinion |
Assessment opinion (746 KB)
|
| Revised PDD |
Revised PDD (882 KB)
Revised PDD - track changes (1129 KB)
|
| Supplementary documents |
Appendix 1 - PoA5979-CPA1-DD v13 20170531_clean.pdf (1359 KB)
Appendix 2 - PoA5979-CPA1-DD v13 20170531_track changes.pdf (1494 KB)
Appendix 3 - PoA5979-CPA2-DD v6 20170531_clean.pdf (1254 KB)
Appendix 4 - PoA5979-CPA2-DD v6 20170531_track changes.pdf (1502 KB)
Appendix 5 - PoA5979-CPA10-DD v6 20170531_clean.pdf (1085 KB)
Appendix 6 - PoA5979-CPA10-DD v6 20170531_track changes.pdf (1152 KB)
|
| Signed form |
Signed form (1881 KB)
|
| DOE clarification | |
| VVS version | VVS 9.0 |
| Current status | 14 Aug 17 -
Approved
Effective approval date: 13 Aug 17
|
| Historic statuses |
10 Jul 17 -
Published 24 Jul 17 - Summary note being prepared 24 Jul 17 - Awaiting EB decision |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: