Project: 2078 Inner Mongolia North Longyuan Huitengxile WindFarm Project - Request for post-registration changes
Project 2078 Inner Mongolia North Longyuan Huitengxile WindFarm Project
PRC ref PRC-2078-001
Process track Issuance
DOE BVI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 26 Dec 08 - 25 Dec 15
Assessment opinion Assessment opinion (213 KB)
Revised PDD Revised PDD (423 KB)   Revised PDD - track changes (487 KB)
Supplementary documents
Signed form Signed form (109 KB)
DOE clarification
VVS version VVS 2.0
Current status 16 May 13 - Approved
Effective approval date: 16 May 13
Historic statuses 15 Apr 13 - Request published