23:56 01 Feb 25
Project:
5804 Biogas Project at MH Bio-Ethanol Distillery, Cambodia
- Request for post-registration changes
Project | 5804 Biogas Project at MH Bio-Ethanol Distillery, Cambodia |
---|---|
PRC ref | PRC-5804-001 |
Process track | Prior approval |
DOE | KEA |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 01 Aug 12 - 31 Jul 19 |
Assessment opinion | Assessment opinion (542 KB) |
Revised PDD | Revised PDD (639 KB) Revised PDD - track changes (655 KB) |
Supplementary documents | |
Signed form | Signed form (163 KB) |
DOE clarification |
DOE clarification 1 - Responses to Request for Clarificatios_MH Bio Cambodia_updated.pdf (67 KB)
|
VVS version | VVS 2.0 |
Current status | 15 Apr 15 -
Approved
Effective approval date: 09 Apr 15
|
Historic statuses |
18 Nov 14 -
Published 26 Feb 15 - Awaiting DOE clarifications 05 Mar 15 - DOE clarifications received 05 Mar 15 - Summary note being prepared 19 Mar 15 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: