08:16 25 Oct 25
Project:
5804 Biogas Project at MH Bio-Ethanol Distillery, Cambodia
- Request for post-registration changes
| Project | 5804 Biogas Project at MH Bio-Ethanol Distillery, Cambodia |
|---|---|
| PRC ref | PRC-5804-001 |
| Process track | Prior approval |
| DOE | KEA |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 01 Aug 12 - 31 Jul 19 |
| Assessment opinion |
Assessment opinion (542 KB)
|
| Revised PDD |
Revised PDD (639 KB)
Revised PDD - track changes (655 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (163 KB)
|
| DOE clarification |
DOE clarification 1 - Responses to Request for Clarificatios_MH Bio Cambodia_updated.pdf (67 KB)
|
| VVS version | VVS 2.0 |
| Current status | 15 Apr 15 -
Approved
Effective approval date: 09 Apr 15
|
| Historic statuses |
18 Nov 14 -
Published 26 Feb 15 - Awaiting DOE clarifications 05 Mar 15 - DOE clarifications received 05 Mar 15 - Summary note being prepared 19 Mar 15 - Awaiting EB decision |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: