Project: 5804 Biogas Project at MH Bio-Ethanol Distillery, Cambodia - Request for post-registration changes
Project 5804 Biogas Project at MH Bio-Ethanol Distillery, Cambodia
PRC ref PRC-5804-001
Process track Prior approval
DOE KEA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 01 Aug 12 - 31 Jul 19
Assessment opinion Assessment opinion (542 KB)
Revised PDD Revised PDD (639 KB)   Revised PDD - track changes (655 KB)
Supplementary documents
Signed form Signed form (163 KB)
DOE clarification DOE clarification 1 - Responses to Request for Clarificatios_MH Bio Cambodia_updated.pdf (67 KB)



VVS version VVS 2.0
Current status 15 Apr 15 - Approved
Effective approval date: 09 Apr 15
Historic statuses 18 Nov 14 - Published
26 Feb 15 - Awaiting DOE clarifications
05 Mar 15 - DOE clarifications received
05 Mar 15 - Summary note being prepared
19 Mar 15 - Awaiting EB decision