Project: 2637 AVN08-S-02, Methane Recovery and Biogas Utilization Project, Nghe An Province, Vietnam - Request for post-registration changes
Project 2637 AVN08-S-02, Methane Recovery and Biogas Utilization Project, Nghe An Province, Vietnam
PRC ref PRC-2637-002
Process track Prior approval
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 12 Oct 10 - 11 Oct 17
Assessment opinion Assessment opinion (151 KB)
Revised PDD Revised PDD (746 KB)   Revised PDD - track changes (774 KB)
Supplementary documents
Signed form Signed form (108 KB)
DOE clarification
VVS version VVS 2.0
Current status 20 Feb 14 - Approved
Effective approval date: 19 Feb 14
Historic statuses 14 Jan 14 - Published
14 Jan 14 - Summary note being prepared
29 Jan 14 - Awaiting EB decision