Project: 7207 K-water hydropower VII - Request for post-registration changes
Project 7207 K-water hydropower VII
PRC ref PRC-7207-001
Process track Issuance
DOE KTR
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Dec 12 - 30 Nov 22
Assessment opinion Assessment opinion (761 KB)
Revised PDD Revised PDD (1310 KB)   Revised PDD - track changes (1401 KB)
Supplementary documents
Signed form Signed form (238 KB)
DOE clarification
VVS version VVS 9.0
Current status 10 Aug 17 - Approved
Effective approval date: 10 Aug 17
Historic statuses 12 Jul 17 - Request published