12:01 22 Dec 24
Project:
4891 Dak Psi 3 and 4 Hydropower Project
- Request for post-registration changes
Project | 4891 Dak Psi 3 and 4 Hydropower Project |
---|---|
PRC ref | PRC-4891-001 |
Process track | Issuance |
DOE | KBS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Changes to the project or programme design
|
Applicable crediting period | 06 Nov 11 - 05 Nov 18 |
Assessment opinion | Assessment opinion (283 KB) |
Revised PDD | Revised PDD (956 KB) Revised PDD - track changes (942 KB) |
Supplementary documents | |
Signed form | Signed form (3273 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 27 Mar 13 -
Approved
Effective approval date: 27 Mar 13
|
Historic statuses |
26 Feb 13 -
Request published |