Project: 4891 Dak Psi 3 and 4 Hydropower Project - Request for post-registration changes
Project 4891 Dak Psi 3 and 4 Hydropower Project
PRC ref PRC-4891-001
Process track Issuance
DOE KBS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 06 Nov 11 - 05 Nov 18
Assessment opinion Assessment opinion (283 KB)
Revised PDD Revised PDD (956 KB)   Revised PDD - track changes (942 KB)
Supplementary documents
Signed form Signed form (3273 KB)
DOE clarification
VVS version VVS 2.0
Current status 27 Mar 13 - Approved
Effective approval date: 27 Mar 13
Historic statuses 26 Feb 13 - Request published