Project: 10030 Household energy appliance programme - Request for post-registration changes
Project 10030 Household energy appliance programme
PRC ref PRC-10030-001
Process track Prior approval
DOE Earthood
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: Changes to the programme boundary to expand geographical coverage, Use of positive lists or related provisions is introduced or modified based on the valid version of approved tools pertaining to demonstration of additionality of small-scale or microscale project activities, Geographical boundary of the PoA is expanded within the host Party or to include one or more host Parties, Addition or change of technologies/measures with or without addition or change of applied methodologies, A revision to the eligibility criteria pertaining to the demonstration of additionality, Removal of applied methodologies and/or standardized baselines from the registered PoA
Applicable crediting period 10 Mar 16 - 09 Mar 23
Assessment opinion Assessment opinion (367 KB)
Revised PDD Revised PDD (1125 KB)   Revised PDD - track changes (1463 KB)
Supplementary documents Appendix 1 - 10030 LoA_ Cambodia.pdf (151 KB)
Appendix 2 - 10030 LoA_Lao PDR.pdf (661 KB)
Appendix 3 - ER calculation spreadsheet_revised.xls (54 KB)
Appendix 4 - Reg_Form17v07_PoA10030_PRC validation_Filled.pdf (117 KB)
Signed form Signed form (117 KB)
DOE clarification DOE clarification 1 - Clarification Letter.pdf (170 KB)
VVS version VVS-PoA 2.0
Current status 26 Jul 19 - Approved
Effective approval date: 25 Jul 19
Historic statuses 27 May 19 - Published
07 Jun 19 - Awaiting DOE clarifications
21 Jun 19 - DOE clarifications received
21 Jun 19 - Summary note being prepared
05 Jul 19 - Awaiting EB decision