Project: 3895 Power generation from renewable sources – Arvoredo and Varginha Small Hydropower Plants - Request for post-registration changes
Project 3895 Power generation from renewable sources – Arvoredo and Varginha Small Hydropower Plants
PRC ref PRC-3895-001
Process track Issuance
DOE EPIC
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard?

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 25 Sep 12 - 24 Sep 19
Assessment opinion Assessment opinion (357 KB)
Revised PDD Revised PDD (2179 KB)   Revised PDD - track changes (2207 KB)
Supplementary documents
Signed form Signed form (192 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 09 Nov 26 - Approved
Effective approval date: 09 Nov 26
Historic statuses 09 Oct 26 - Request published