Project: 10240 102 MW Wind Power Project, ONGC, Rajasthan, India - Request for post-registration changes
Project 10240 102 MW Wind Power Project, ONGC, Rajasthan, India
PRC ref PRC-10240-002
Process track Issuance
DOE LGAI Tech. Center S.A
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?
Applicable crediting period 25 Jul 16 - 24 Jul 23
Assessment opinion Assessment opinion (179 KB)
Revised PDD Revised PDD (542 KB)   Revised PDD - track changes (517 KB)
Supplementary documents
Signed form Signed form (159 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 18 Jun 25 - Approved
Effective approval date: 18 Jun 25
Historic statuses 20 May 25 - Request published