Project: 3783 8.5 MW wind power based electricity generation in the Northern and Western region grids of India - Request for post-registration changes
Project 3783 8.5 MW wind power based electricity generation in the Northern and Western region grids of India
PRC ref PRC-3783-001
Process track Issuance
DOE LRQA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 10 Nov 10 - 09 Nov 20
Assessment opinion Assessment opinion (232 KB)
Revised PDD Revised PDD (1137 KB)   Revised PDD - track changes (1288 KB)
Supplementary documents
Signed form Signed form (752 KB)
DOE clarification
VVS version VVS 2.0
Current status 10 Jul 14 - Approved
Effective approval date: 10 Jul 14
Historic statuses 11 Jun 14 - Request published