Project: 0958 2 x 5 MW Baner khad & Iku khad small hydroelectric project for a grid system - Request for post-registration changes
Project 0958 2 x 5 MW Baner khad & Iku khad small hydroelectric project for a grid system
PRC ref PRC-0958-001
Process track Prior approval
DOE BVI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 15 Feb 2011 - 31 Mar 2013
Assessment opinion Assessment opinion (594 KB)
Revised PDD  
Supplementary documents Appendix 1 - MR 12th November 2013 clean Version.pdf (1067 KB)
Signed form Signed form (1868 KB)
DOE clarification
VVS version VVS 2.0
Current status 14 Mar 14 - Approved
Effective approval date: 12 Mar 14
Historic statuses 04 Feb 14 - Published
04 Feb 14 - Summary note being prepared
20 Feb 14 - Awaiting EB decision