Project:
0958 2 x 5 MW Baner khad & Iku khad small hydroelectric project for a grid system
- Request for post-registration changes
Project | 0958 2 x 5 MW Baner khad & Iku khad small hydroelectric project for a grid system |
---|---|
PRC ref | PRC-0958-001 |
Process track | Prior approval |
DOE | BVI |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
|
Assessment opinion | Assessment opinion (594 KB) |
Revised PDD | |
Supplementary documents |
Appendix 1 - MR 12th November 2013 clean Version.pdf (1067 KB)
|
Signed form | Signed form (1868 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 14 Mar 14 -
Approved
Effective approval date: 12 Mar 14
|
Historic statuses |
04 Feb 14 -
Published 04 Feb 14 - Summary note being prepared 20 Feb 14 - Awaiting EB decision |