Project:
0958 2 x 5 MW Baner khad & Iku khad small hydroelectric project for a grid system
- Request for post-registration changes
| Project | 0958 2 x 5 MW Baner khad & Iku khad small hydroelectric project for a grid system |
|---|---|
| PRC ref | PRC-0958-001 |
| Process track | Prior approval |
| DOE | BVI |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
|
| Assessment opinion |
Assessment opinion (594 KB)
|
| Revised PDD | |
| Supplementary documents |
Appendix 1 - MR 12th November 2013 clean Version.pdf (1067 KB)
|
| Signed form |
Signed form (1868 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 14 Mar 14 -
Approved
Effective approval date: 12 Mar 14
|
| Historic statuses |
04 Feb 14 -
Published 04 Feb 14 - Summary note being prepared 20 Feb 14 - Awaiting EB decision |