11:45 15 Nov 25
Project:
0763 Al-Shaheen Oil Field Gas Recovery and Utilization Project
- Request for post-registration changes
| Project | 0763 Al-Shaheen Oil Field Gas Recovery and Utilization Project |
|---|---|
| PRC ref | PRC-0763-001 |
| Process track | Issuance |
| DOE | KBS |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
|
| Applicable crediting period | 29 May 14 - 28 May 21 |
| Assessment opinion |
Assessment opinion (529 KB)
|
| Revised PDD |
Revised PDD (928 KB)
Revised PDD - track changes (923 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (245 KB)
|
| DOE clarification | |
| VVS version | VVS-PA 2.0 |
| Current status | 16 Apr 21 -
Approved
Effective approval date: 16 Apr 21
|
| Historic statuses |
18 Mar 21 -
Request published |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: