Project: 0763 Al-Shaheen Oil Field Gas Recovery and Utilization Project - Request for post-registration changes
Project 0763 Al-Shaheen Oil Field Gas Recovery and Utilization Project
PRC ref PRC-0763-001
Process track Issuance
DOE KBS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 Mar 2015 - 31 Mar 2015

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?
Applicable crediting period 29 May 14 - 28 May 21
Assessment opinion Assessment opinion (529 KB)
Revised PDD Revised PDD (928 KB)   Revised PDD - track changes (923 KB)
Supplementary documents
Signed form Signed form (245 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 16 Apr 21 - Approved
Effective approval date: 16 Apr 21
Historic statuses 18 Mar 21 - Request published