Project: 3606 Shandong Juye Biomass Power Generation Project - Request for post-registration changes
Project 3606 Shandong Juye Biomass Power Generation Project
PRC ref PRC-3606-001
Process track Prior approval
DOE BVI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 11 Sep 10 - 10 Sep 17
Assessment opinion Assessment opinion (222 KB)
Revised PDD Revised PDD (469 KB)   Revised PDD - track changes (567 KB)
Supplementary documents Appendix 1 - NPV spreadsheet_Juye_Ref.3606.xls (178 KB)
Appendix 2 - ER Calculation Sheet_Juye Biomass.xls (108 KB)
Signed form Signed form (48 KB)
DOE clarification
VVS version VVS 2.0
Current status 03 Apr 13 - Approved
Effective approval date: 27 Mar 13
Historic statuses 16 Jan 13 - Published
06 Feb 13 - Awaiting DOE clarifications
19 Feb 13 - DOE clarifications received
19 Feb 13 - Summary note being prepared
06 Mar 13 - Awaiting EB decision