Project:
3606 Shandong Juye Biomass Power Generation Project
- Request for post-registration changes
Project | 3606 Shandong Juye Biomass Power Generation Project |
---|---|
PRC ref | PRC-3606-001 |
Process track | Prior approval |
DOE | BVI |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 11 Sep 10 - 10 Sep 17 |
Assessment opinion | Assessment opinion (222 KB) |
Revised PDD | Revised PDD (469 KB) Revised PDD - track changes (567 KB) |
Supplementary documents |
Appendix 1 - NPV spreadsheet_Juye_Ref.3606.xls (178 KB)
Appendix 2 - ER Calculation Sheet_Juye Biomass.xls (108 KB) |
Signed form | Signed form (48 KB) |
DOE clarification |
|
VVS version | VVS 2.0 |
Current status | 03 Apr 13 -
Approved
Effective approval date: 27 Mar 13
|
Historic statuses |
16 Jan 13 -
Published 06 Feb 13 - Awaiting DOE clarifications 19 Feb 13 - DOE clarifications received 19 Feb 13 - Summary note being prepared 06 Mar 13 - Awaiting EB decision |