Project: 0986 Bundled 15 MW Wind Power Project in India - Request for post-registration changes
Project 0986 Bundled 15 MW Wind Power Project in India
PRC ref PRC-0986-001
Process track Issuance
DOE EPIC
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 28 Apr 07 - 27 Apr 17
Assessment opinion Assessment opinion (211 KB)
Revised PDD Revised PDD (1280 KB)   Revised PDD - track changes (1298 KB)
Supplementary documents
Signed form Signed form (140 KB)
DOE clarification
VVS version VVS 2.0
Current status 24 Feb 17 - Approved
Effective approval date: 24 Feb 17
Historic statuses 26 Jan 17 - Request published