Project: 0174 San Isidro Hydroelectric Plant - Request for post-registration changes
Project 0174 San Isidro Hydroelectric Plant
PRC ref PRC-0174-001
Process track Prior approval
DOE AENOR
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 29 Jun 09 - 28 Jun 16
Assessment opinion Assessment opinion (336 KB)
Revised PDD Revised PDD (1138 KB)   Revised PDD - track changes (1183 KB)
Supplementary documents
Signed form Signed form (143 KB)
DOE clarification
VVS version VVS 2.0
Current status 07 Jan 13 - Approved
Effective approval date: 07 Jan 13
Historic statuses 11 Dec 12 - Published
11 Dec 12 - Summary note being prepared
17 Dec 12 - Awaiting EB decision