Project: 9554 Mae Klong Hydropower Project - Request for post-registration changes
Project 9554 Mae Klong Hydropower Project
PRC ref PRC-9554-001
Process track Issuance
DOE BVI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Jan 14 - 31 Dec 20
Assessment opinion Assessment opinion (139 KB)
Revised PDD Revised PDD (1036 KB)   Revised PDD - track changes (552 KB)
Supplementary documents
Signed form Signed form (1050 KB)
DOE clarification
VVS version VVS 9.0
Current status 03 Apr 17 - Approved
Effective approval date: 03 Apr 17
Historic statuses 03 Mar 17 - Request published