Project: 6381 Ishasha 6.6 MW Small Hydropower Project - Request for post-registration changes
Project 6381 Ishasha 6.6 MW Small Hydropower Project
PRC ref PRC-6381-001
Process track Issuance
DOE AENOR
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Jul 12 - 30 Jun 22
Assessment opinion Assessment opinion (360 KB)
Revised PDD Revised PDD (1282 KB)   Revised PDD - track changes (1349 KB)
Supplementary documents Appendix 1 - Ishasha_EF & ER Calculations 8Oct14.xlsx (17 KB)
Signed form Signed form (441 KB)
DOE clarification
VVS version VVS 7.0
Current status 24 Apr 15 - Approved
Effective approval date: 24 Apr 15
Historic statuses 26 Mar 15 - Request published