15:01 26 Dec 24
Project:
6381 Ishasha 6.6 MW Small Hydropower Project
- Request for post-registration changes
Project | 6381 Ishasha 6.6 MW Small Hydropower Project |
---|---|
PRC ref | PRC-6381-001 |
Process track | Issuance |
DOE | AENOR |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 01 Jul 12 - 30 Jun 22 |
Assessment opinion | Assessment opinion (360 KB) |
Revised PDD | Revised PDD (1282 KB) Revised PDD - track changes (1349 KB) |
Supplementary documents |
Appendix 1 - Ishasha_EF & ER Calculations 8Oct14.xlsx (17 KB)
|
Signed form | Signed form (441 KB) |
DOE clarification | |
VVS version | VVS 7.0 |
Current status | 24 Apr 15 -
Approved
Effective approval date: 24 Apr 15
|
Historic statuses |
26 Mar 15 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: