23:32 02 Jan 25
Project:
5368 Wampu Hydro Electric Power Project
- Request for post-registration changes
Project | 5368 Wampu Hydro Electric Power Project |
---|---|
PRC ref | PRC-5368-001 |
Process track | Issuance |
DOE | TÜV SÜD |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
|
Applicable crediting period | 30 Apr 14 - 29 Apr 21 |
Assessment opinion | Assessment opinion (233 KB) |
Revised PDD | Revised PDD (687 KB) Revised PDD - track changes (709 KB) |
Supplementary documents | |
Signed form | Signed form (1130 KB) |
DOE clarification | |
VVS version | VVS-PA 2.0 |
Current status | 29 May 20 -
Approved
Effective approval date: 29 May 20
|
Historic statuses |
30 Apr 20 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: