Project: 5368 Wampu Hydro Electric Power Project - Request for post-registration changes
Project 5368 Wampu Hydro Electric Power Project
PRC ref PRC-5368-001
Process track Issuance
DOE TÜV SÜD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?
Applicable crediting period 30 Apr 14 - 29 Apr 21
Assessment opinion Assessment opinion (233 KB)
Revised PDD Revised PDD (687 KB)   Revised PDD - track changes (709 KB)
Supplementary documents
Signed form Signed form (1130 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 29 May 20 - Approved
Effective approval date: 29 May 20
Historic statuses 30 Apr 20 - Request published