Project: 0152 Rang Dong Oil Field Associated Gas Recovery and Utilization Project - Request for post-registration changes
Project 0152 Rang Dong Oil Field Associated Gas Recovery and Utilization Project
PRC ref PRC-0152-001
Process track Prior approval
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 01 Dec 01 - 30 Nov 11
Assessment opinion Assessment opinion (1872 KB)
Revised PDD Revised PDD (890 KB)   Revised PDD - track changes (1096 KB)
Supplementary documents Appendix 1 - 140729 ER Estimation(Revised PDD).zip (48 KB)
Appendix 2 - PDD gas composition.zip (49 KB)
Appendix 3 - note on confidential appendices.pdf (5389 bytes)
Appendix 4 - Upload Information for Documents.pdf (14 KB)
Signed form Signed form (52 KB)
DOE clarification DOE clarification 1 - UK AR6 PRC CDM VER0031.pdf (1872 KB)
VVS version VVS 2.0
Current status 04 Dec 14 - Approved
Effective approval date: 03 Dec 14
Historic statuses 09 Sep 14 - Published
13 Oct 14 - Awaiting DOE clarifications
28 Oct 14 - DOE clarifications received
28 Oct 14 - Summary note being prepared
12 Nov 14 - Awaiting EB decision