Project: 1107 Golden Hope Composting Project - Kerdau - Request for post-registration changes
Project 1107 Golden Hope Composting Project - Kerdau
PRC ref PRC-1107-001
Process track Prior approval
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 17 Dec 2007 - 31 Aug 2011

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 17 Dec 07 - 16 Dec 14
Assessment opinion Assessment opinion (303 KB)
Revised PDD Revised PDD (441 KB)   Revised PDD - track changes (878 KB)
Supplementary documents
Signed form Signed form (162 KB)
DOE clarification DOE clarification 1 - 20120816_CER estimation Kerdau_MP_17.12.2007-31.08.2011.xls (790 KB)
DOE clarification 2 - 20120823_KERDAU SSCPDD GH Composting III F.pdf (441 KB)
DOE clarification 3 - PRC_KERDAU SSCPDD GH Composting III F_track change (version 6 track change for clarification request).pdf (408 KB)
VVS version VVS 2.0
Current status 27 Sep 12 - Approved
Effective approval date: 27 Sep 12
Historic statuses 31 Jul 12 - Published
14 Aug 12 - Awaiting DOE clarifications
27 Aug 12 - DOE clarifications received
27 Aug 12 - Summary note being prepared
06 Sep 12 - Awaiting EB decision