Project: 5962 International water purification programme - Request for post-registration changes
Project 5962 International water purification programme
PRC ref PRC-5962-007
Process track Prior approval
DOE CCSC
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Change a version of methodology
Methodology(ies) list AMS-III.AV. ver. 5 - Low greenhouse gas emitting safe drinking water production systems
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: Use of positive lists or related provisions is introduced or modified based on the valid version of approved tools pertaining to demonstration of additionality of small-scale or microscale project activities, Voluntary update of the applied methodologies or the other applied methodological regulatory documents to a later valid version or voluntary change to other methodologies
Applicable crediting period 16 Nov 12 - 15 Nov 19
Assessment opinion Assessment opinion (594 KB)
Revised PDD Revised PDD (2293 KB)   Revised PDD - track changes (2368 KB)
Supplementary documents Appendix 1 - PRC Validation Report_POA-DD5962_v3_tc.pdf (599 KB)
Signed form Signed form (56 KB)
DOE clarification DOE clarification 1 - Clarification_PRC5962-007.pdf (99 KB)
VVS version VVS-PoA 2.0
Current status 25 Jul 19 - Approved
Effective approval date: 23 Jul 19
Historic statuses 20 May 19 - Published
03 Jun 19 - Awaiting DOE clarifications
17 Jun 19 - DOE clarifications received
17 Jun 19 - Summary note being prepared
02 Jul 19 - Awaiting EB decision